A Groundwork company - serving Oakland, CA
New Detached ADU in Burlingame, CA | Groundwork Construction Co. of Oakland

New Detached ADU in Burlingame - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Burlingame: What It Takes and What It Costs

A new detached ADU in Burlingame is a fully separate second dwelling built behind the main house, and it runs roughly $90,000 to $220,000 depending on size, site work, and finish level. Plan on 9 to 14 months from first site walk to final inspection, since Burlingame’s design-review process adds real time to the front end. The single-family zoning here allows detached ADUs of up to 1,200 square feet, but the lot, the setbacks, and the existing house all shape what actually gets built. Call (833) 997-7759 to set up a free on-site estimate.

Call (833) 997-7759

How a Detached ADU Gets Built, Stage by Stage

Detached ADUs are their own animal. The work happens outdoors, away from the main house, and the site itself is a third of the job. Here’s how the sequence actually runs.

Stage 1: Site walk and feasibility (week 1)

We walk the yard, check lot coverage and setbacks against what Burlingame allows, and locate the utility tie-ins. You’ll decide how much square footage you want and whether the unit is a rental, an in-law suite, or a home office. This is where we flag the things that quietly kill budgets: a sewer lateral that runs under the proposed slab, a heritage tree in the build zone, or a slope that needs retaining.

Stage 2: Design and permit submission (months 1-3)

Drawings get prepared, then submitted to the city. Burlingame’s design review adds a step most Peninsula cities don’t have, and a detached ADU in the rear yard still has to pass it. Expect 8 to 16 weeks before you have a permit in hand, longer if revisions come back. You’ll sign off on the floor plan and exterior materials here.

Stage 3: Site prep and foundation (weeks 1-5 of construction)

Demo of any existing shed or hardscape, grading, trenching for utilities, and the foundation pour. On Burlingame’s older lots this stage surfaces surprises: old septic remnants, undocumented drainage lines, or a rear property line that doesn’t match the survey. Foundation type matters – a slab is cheaper and faster, a raised pier-and-beam foundation matches the housing stock and makes future plumbing work far easier.

Stage 4: Framing, rough-in, and inspections (weeks 5-14)

Framing goes up, then roofing, windows, and the rough plumbing, electrical, and HVAC. Each of those gets its own inspection before the walls close. This is where the building department sees the work mid-stream, so scheduling matters. You’ll confirm window and door selections, siding, and roof material before this stage starts – after that, changes cost real money.

Stage 5: Finish-out and final (weeks 14-24)

Insulation, drywall, cabinetry, flooring, fixtures, paint, and landscaping to close out the site. Final inspection comes last. Most clients pair the interior finish with work in the main house, which is why homeowners often pair this with Kitchen Design & Layout in Burlingame when the ADU kitchenette or the main kitchen is getting upgraded at the same time.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached ADU

Every detached unit comes down to five or six decisions that swing both the cost and how the building lives ten years out.

  • Foundation type. Slab is the fastest and least expensive route, but it buries your plumbing in concrete. A raised foundation costs more upfront and pays you back every time a drain needs attention – and it matches the pier-and-beam construction common on older Burlingame lots.
  • Square footage. A 500-square-foot studio and a 1,000-square-foot one-bedroom are different projects. Smaller units save on materials but not on site work, utility trenching, or the permit process – those costs stay nearly fixed.
  • Exterior cladding. Stucco reads clean and matches Spanish Colonial Revival homes. James Hardie fiber cement lap siding holds paint longer in damp coastal air and matches the Craftsman and Tudor stock. Wood is beautiful and needs repainting every 5 to 7 years in this climate.
  • Windows and doors. In Burlingame’s fog belt, dual-pane matters. Andersen and Marvin both build units that hold up, and brands like ECO Window Systems make a solid value option. Skip single-pane wood units unless you want to repaint frames every few years.
  • Roofing. Composition shingle from GAF or CertainTeed is the practical pick and runs the low end. Standing seam metal costs more but handles the damp winters and the shading from mature trees better.
  • Interior finish. Luxury vinyl plank over tile is the honest call for a rental. Tile or hardwood suits an owner-occupied unit. Cabinetry grade from a mid-tier line keeps the number in range; going custom pushes it well past it.

What a New Detached ADU Costs in Burlingame, CA

Detached ADU construction in Burlingame runs $90,000 to $220,000, with the typical project landing in the middle of that band. The full home additions & adu line starts at $45,000 to $130,000 for smaller or attached scope, and a detached unit pushes toward the top because it carries its own foundation, roof, and utility trench.

Line item Typical range
Foundation and site prep $12,000 – $28,000
Framing, shell, and roofing $30,000 – $65,000
Windows, doors, and exterior finish $12,000 – $30,000
Plumbing, electrical, and HVAC $15,000 – $35,000
Interior finish and fixtures $18,000 – $55,000
Permits and design review $4,000 – $15,000

Four variables drive a project from the low end to the high end. Size is the biggest. Site access is second – a rear yard you can’t get a concrete truck near costs more than one you can. Whether the sewer and electrical service need upgrading is third, and older Burlingame lots frequently do. Finish grade is fourth. Permit scope caps it: a fire-sprinkler requirement or a geotechnical report adds real dollars.

A written estimate from us covers design coordination, permits pulled in our name, all labor and materials, and cleanup. It excludes landscape restoration beyond grading, utility connection fees charged by the city, and anything the design drawings didn’t show – which is why we flag surprises in writing before work starts. Upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Burlingame’s Housing Stock and Climate Do to This Job

Burlingame is one of the oldest and most architecturally protected suburbs on the Peninsula, so a new detached ADU here is a design-review conversation, not a simple permit. The city’s review process applies even to rear-yard structures, and the drawings need to respect the look of the surrounding homes in Burlingame Park and Easton Addition. We plan 8 to 16 weeks for that step and build schedule slack around it.

The lots themselves complicate things. Most of the core is early-1900s through 1940s single-family homes – Craftsman bungalows, Spanish Colonial Revival, Tudor cottages – on narrow lots with tight rear setbacks. When we open up the existing house for utility tie-ins, we routinely find previous remodel layers stacked on original framing, which means code upgrades the drawings never anticipated: foundation bolting, shear paneling, electrical. On a project where the new detached ADU ties into the main panel, that cascades.

Climate matters too. Burlingame sits between the bay and the coastal hills, so summers are cool and fog-influenced and winters are damp with persistent morning moisture. That makes flashing, vapor barriers, and exterior detailing critical on any wood-sided or stucco structure. We build to shed water first. Homeowners often pair this with Backsplash, Tile & Flooring in Burlingame when the main house gets its own refresh during the project.

Serving Burlingame, CA – Our Local Coverage Area

We serve Burlingame and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Burlingame

Get a Free On-Site Estimate for Your Burlingame Detached ADU

A free estimate starts with a site walk at your property. We check the lot, the setbacks, the utility tie-ins, and the existing house’s condition, then follow up with a written line-item quote covering design, permits, and construction. Our technicians have up to 12 years of experience, and every job is covered by the 730-Day Done Right Promise. We cover Burlingame and the surrounding Peninsula, and calls are answered by a live person 24/7. Call (833) 997-7759 to schedule yours.

Written by the team at Groundwork Construction Co.

Why Burlingame Chooses Groundwork Construction Co. of Oakland

We set the standard for new detached ADU in Burlingame.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Burlingame

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burlingame Customers Say

Trusted by homeowners across Burlingame and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ready for New Detached ADU in Burlingame?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Burlingame.

(833) 997-7759

Request a Free Estimate in Burlingame

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch