Cabinets & Countertops in Alameda: What the Job Really Costs and How It Runs
Cabinets & countertops in Alameda typically run $14,000 – $45,000 for a full replacement, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. A standard tear-out and rebuild takes 3 to 5 weeks of on-site work, plus 2 to 4 weeks of order and lead time before we ever swing a hammer. Call (833) 997-7759 and we’ll walk your kitchen and give you a written, line-item number on the spot.
How the Cabinet and Countertop Job Actually Runs, Stage by Stage
Most contractors wave a hand and say “about a month.” Here’s what actually happens, in order, so you know when you’ll be without a sink and when you need to make a decision.
Stage 1: Measure, template, and order (days 1 – 5, then a wait)
We take field measurements to the 1/16 inch. If you’re choosing stone or quartz, the fabricator often wants a digital template only after the base cabinets are set, so the order splits into two parts. You decide door style, finish, and box construction here, and this is when a wrong call costs the most money. Lead time runs 3 to 6 weeks on semi-custom and 6 to 10 on full custom.
Stage 2: Demo and prep (days 1 – 2 on site)
Old cabinets, countertop, and backsplash come out. We shut off and cap the plumbing, pull the old electrical, and inspect what’s behind the wall: water damage, failed shutoffs, undiscovered knob-and-tube, or a wall that isn’t plumb. On Alameda Victorians this is where surprises live. You’ll get a call before anything extra gets done.
Stage 3: Rough-in and inspection (days 2 – 4)
If the layout moves, the electrician and plumber rough in the new outlets, the under-sink supply and drain, and the range or hood circuit. The city inspects the rough work before cabinets go back. Skipping this step is the fastest way to a failed final, and we pull the permit and pass the inspection as part of the job.
Stage 4: Cabinet setting and countertop template (days 4 – 7)
Base cabinets get leveled, shimmed, and fastened to the wall. The countertop fabricator then templates against the actual boxes, because a wall that’s off a quarter inch will show up in a stone seam. You confirm the sink cutout, faucet hole count, and edge profile at this stage.
Stage 5: Countertop install, backsplash, and punch (days 3 – 5 after template)
The slab or engineered top sets with adhesive and seam, the sink and faucet go in, the backsplash gets set and grouted, and we do a final walkthrough. You’ll have a working kitchen by the end, and the punch list gets closed out before the final invoice, backed by our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make, and What Each One Costs You Later
- Stock vs. semi-custom vs. custom cabinets. Stock comes in fixed sizes and runs the low end at $4,000 – $7,000 installed; semi-custom fills gaps and lands around $8,000 – $11,000; full custom goes over $13,000. Semi-custom is the honest sweet spot for most Alameda homes.
- Particleboard vs. plywood boxes. Particleboard is cheaper and swells fast in damp marine air; plywood holds up far better in a fog-belt house. Worth the upcharge here.
- Quartz vs. granite vs. butcher block. Quartz is non-porous and forgives neglect. Granite is durable but porous and needs sealing. Butcher block is warm and cheap but needs oil. A quartz top in the $4,000 – $6,500 range on a mid-size kitchen is typical.
- Soft-close and full-extension hardware. The upgrade most people skip and then regret. Standard hinges wear out in 5 – 7 years under daily use.
- Islands. A peninsula or island adds real function but pushes the price $3,000 – $10,000, and it may need a permit if it moves the electrical or gas.
What Cabinets & Countertops Cost in Alameda, CA
Our full cabinets & countertops lead range is $14,000 – $45,000. The floor is a smaller kitchen with semi-custom boxes and a mid-grade quartz top; the ceiling is a large kitchen with full custom cabinetry, stone slabs, a relocated island, and new electrical. Here’s the line-item breakdown you’ll see on a written estimate:
| Item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
Five variables push a job up or down. Kitchen size is the biggest. Existing condition is second: dry rot behind a cabinet run, an out-of-level floor, or a wall that needs reframing all add real hours. Relocating plumbing or electrical to a new sink or range location adds $1,500 – $4,000. Material grade swings the cabinet line by $6,000 or more. And permit scope matters: a straight swap with no layout change may need no permit, but moving walls or mechanicals does. Every estimate we write is line-item, fixed-price, and shows exactly what’s included and what’s excluded, so the number you see is the number you pay. Call (833) 997-7759 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Alameda Homes Specifically Do to This Job
Alameda’s housing stock is the story here. On the main island, ZIP 94501 is dominated by 1880s – 1930s Victorians and Craftsmans, many sitting on soft-story ground floors over raised crawlspaces. The damp marine air and a shallow water table (the whole island is filled former marshland) hollow out cabinet boxes and corrode hinges and fasteners in ways you rarely see in a dry inland suburb. We routinely open a wall in a Victorian flat off the East End and find old galvanized supply lines or knob-and-tube wiring that has to be replaced before a single new box goes in. On Bay Farm Island (94502), the 1960s – 80s tract homes often have slab-on-grade floors and aluminum wiring, which changes the electrical rough-in entirely. Permitting here runs through the city’s inspection cycle, and if your home sits in a historic-preservation district, exterior-facing changes may need additional review. Salt air off the Bay eats cabinet hardware fast, so we spec stainless and marine-rated fasteners as a default. If the wider project stretches beyond this job, it becomes part of a full Kitchen Remodeling in Alameda, and homeowners often pair this work with our Tub-to-Shower Conversion in Alameda while the house is already torn up.
Serving Alameda, CA – Our Local Coverage Area
We serve Alameda and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Alameda
Plan on 3 to 5 weeks of on-site work, plus 3 to 6 weeks of lead time on cabinets and countertops before that. The order wait is typically the longest part. Call (833) 997-7759 for a scheduling estimate on your kitchen.
Not always. A straight cabinet swap with no layout, plumbing, or electrical change may not require one. But moving a sink, adding an island outlet, or relocating a range circuit does require permits and inspection. We pull the permit and pass the inspection as part of the job. Call (833) 997-7759 to confirm what your project needs.
Yes, and it’s the most common job we do. If we keep the sink, range, and walls in place, the price drops significantly and the timeline tightens. That’s often the difference between a $14,000 job and a $30,000 one.
Most full replacements in Alameda land between $14,000 and $45,000, with cabinets at $4,000 – $13,000 and countertops at $2,000 – $6,500. The exact number depends on size, material grade, and whether plumbing or electrical moves. Call (833) 997-7759 for a free written estimate.
Every project we do is backed by our 730-Day Done Right Promise. If something isn’t right, we come back and fix it. All technicians are background-checked and arrive in uniform.
Get a Free Estimate for Cabinets & Countertops in Alameda
Call (833) 997-7759 for a free on-site estimate for cabinets & countertops in Alameda. A live person answers the phone 24/7, and within the first call we’ll scope your kitchen, flag any permit or structural issues, and explain our 0% financing for 18 months and $1,000 off projects over $10,000. For the wider scope, see our Kitchen Remodeling service, or check our full coverage across Alameda. If the bathroom’s getting done too, we handle Walk-In Showers & Shower Remodeling in Alameda on the same visit.