Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Berkeley, CA: What the Job Actually Involves
New cabinets and countertops in Berkeley typically run $14,000 – $45,000 for a full kitchen’s worth, and a straightforward tear-out and replacement takes about two to three weeks from demo to final caulk. The job is cabinet boxes set plumb and level, countertops templated and cut to fit the actual walls (which are rarely square in this city), and a finished edge where stone meets wall. Call (833) 997-7759 for a free on-site estimate before you commit to a layout.
Day by Day: How We Sequence a Cabinet and Countertop Job
Cabinet and countertop work fails on sequencing, not on materials. The order below protects the countertop template and keeps the kitchen from sitting half-finished for a month.
Stage 1: Site measure and layout lock (1 visit, 60 – 90 minutes)
We measure every wall, check for out-of-square corners, and photograph the plumbing and electrical rough-in behind the existing cabinets. This is where you decide the cabinet line and door style, and where we flag anything that will not fit the plan you sketched. Berkeley walls are often an inch or more out of plumb over a 10-foot run, and discovering that after the boxes arrive is an expensive surprise.
Stage 2: Demo and prep (1 – 2 days)
Old cabinets, countertop, and backsplash come out. We check the wall behind them for water damage, old knob-and-tube wiring that needs to be brought up to current code, and any soft flooring that has to be patched before new cabinets sit on it. If the job is part of a larger scope, this is when the wider project schedule gets set: see Kitchen Remodeling in Berkeley for how the trades line up.
Stage 3: Cabinet install (2 – 3 days)
Base cabinets go in first, shimmed and scribed to the actual wall. Uppers follow, hung off a ledger so they carry their own weight. You decide hardware placement and any pull-out or drawer-organization inserts at this stage, before the boxes are locked in.
Stage 4: Template, fabricate, install countertop (5 – 10 days total, mostly waiting)
We template the countertop against the set cabinets, then the slab is cut and finished offsite. Fabrication usually takes 4 – 7 business days. Countertop install itself is a half day. This wait is the single biggest timeline variable on the whole job, and it is why the cabinet install has to be right before the template is taken.
Stage 5: Sink, faucet, backsplash, punch list (1 – 2 days)
Undermount sink gets set and sealed, faucet and disposal get connected, and we walk the job with you for a punch list before we call it done. Every job carries our 730-Day Done Right Promise, in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Most of the cost spread in this job lives in three decisions: cabinet construction, countertop material, and whether you keep the existing footprint.
- Stock vs. semi-custom vs. custom cabinets. Stock runs cheapest and ships fast but fits only standard sizes, which is a problem in an older Berkeley kitchen with a 33-inch wall. Semi-custom (KraftMaid is one we work with) hits the middle: standard boxes, custom widths and depths. Full custom costs the most and is worth it only when the room is genuinely irregular.
- Plywood vs. particleboard boxes. Plywood boxes hold screws better and survive a leak. Particleboard is cheaper and common in stock lines; it swells and crumbles once water gets in, which matters in a fog-belt city where a slow sink leak goes unnoticed for weeks.
- Quartz vs. granite vs. laminate. Quartz is non-porous and needs no sealing, which suits a busy kitchen. Granite is durable but needs resealing every year or two. Laminate is the budget option and holds up better than its reputation suggests, but seams and heat are its weak points.
- Slab thickness and edge profile. 2cm slabs are lighter and usually need a plywood subtop; 3cm slabs are self-supporting and cost more. A standard eased edge is included; a mitered or waterfall edge adds labor.
- Undermount vs. drop-in sink. Undermount looks cleaner and makes wiping the counter easy, but the countertop has to be cut and finished for it, which is a fabrication cost. Drop-in sinks are cheaper to install and easier to replace later.
- Soft-close and full-extension hardware. Worth the upgrade on a kitchen you plan to live in for a decade. Cheap hinges fail first and are annoying to source replacements for.
Homeowners planning a bathroom at the same time often pair this with Walk-In Showers & Shower Remodeling in Berkeley so the material orders ship together and the crews overlap.
What Cabinets & Countertops Costs in Berkeley, CA
A full cabinet and countertop package in Berkeley runs $14,000 – $45,000. Below is how the line items typically break down, so you can see where the money goes before a bid arrives.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (if included) | $800 – $2,500 |
| Kitchen island (if adding one) | $3,000 – $10,000 |
| Full kitchen scope with cabinets and counters | $14,000 – $45,000 |
Four things push a job from the low end to the high end. Size and cabinet count is the biggest: a galley with 12 linear feet of cabinets sits near the bottom; a 30-foot run with an island sits near the top. Existing condition matters in Berkeley more than most cities. Wall damage, old wiring, or a floor that has to be leveled before cabinets go in adds days and dollars. Relocating plumbing or electrical for a sink or range move is a separate trade and a separate permit line item. Material grade swings the countertop line by a few thousand dollars on its own.
A written estimate covers demo, cabinet install, countertop template and install, sink and faucet hookup, and haul-away. It typically does not cover new appliances, flooring, or the electrical upgrade that older houses sometimes need. We price it upfront, so the number you see is the number you pay, and 0% financing for 18 months plus $1,000 off projects over $10,000 is available.
See the difference
Before
After
Before
After
Before
AfterWhat Berkeley Homes Specifically Do to This Job
Berkeley’s housing stock changes this job more than the material palette does. The flats are full of 1900 – 1930 California bungalows, Craftsman four-squares, and brown-shingle homes, many still carrying original knob-and-tube wiring and single-wall plumbing behind the cabinet line. Pull the old boxes and you find what nobody saw coming: a wall with no stud where the plan assumed one, a drain line that runs through the cabinet footprint, or flooring that was cut short decades ago. That is why we open the wall on day one rather than after the new cabinets arrive.
The hills bring a different set of problems: 1950s – 70s ranchers and post-war splits with cripple walls and soft-story garages. The city’s seismic retrofit mandates mean a cabinet job sometimes runs alongside structural work, and any contractor here has to be as fluent in permitting and structural upgrades as in carpentry. When the scope grows, our Kitchen Remodeling service handles the full sequence from foundation to finish line. We cover the whole of Berkeley, including the ZIP codes 94701, 94702, 94703, and 94712, from the flats up into the hills.
The marine fog belt is the quiet factor. Wood cabinets and any wood trim near a sink or exterior wall stay damp through the summer, so we spec plywood boxes and seal any cabinet run against an exterior wall. If you are also reworking the bathroom in the same house, homeowners often pair this with Tub-to-Shower Conversion in Berkeley to keep the trades on site once.
Serving Berkeley, CA – Our Local Coverage Area
We serve Berkeley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Berkeley
Plan on two to three weeks from demo to final walkthrough. Cabinet install is 2 – 3 days, and the countertop fabrication wait is the long pole, usually 4 – 7 business days between template and install. Call (833) 997-7759 for a schedule estimate on your specific kitchen.
Cosmetic replacement of cabinets and countertops in the same footprint usually does not require a permit. The moment you move a sink, relocate a range, add an island with electrical, or touch structural walls, a permit is generally required, and Berkeley inspects it. Call (833) 997-7759 and we will tell you honestly which side of that line your job falls on.
Yes, and it is the cleanest version of this job. Keeping the sink, range, and plumbing where they are keeps the permit scope small and the timeline short. If your existing layout already works, replacing in place is the fastest route to a new kitchen. Call (833) 997-7759 to talk through whether your layout is worth keeping.
A countertop-only job typically runs $2,000 – $6,500, with the material grade and edge profile driving most of the spread. Quartz sits in the middle, granite is comparable, and laminate is cheaper but less forgiving of heat and seams. Call (833) 997-7759 for an exact quote, estimates are free.
Every cabinet and countertop install carries our 730-Day Done Right Promise: if it is not done right, we make it right. That covers workmanship for two full years, one of the longest guarantees in the residential construction space. Calls are answered by a live person, 24/7, so a warranty question never waits until Monday. Call (833) 997-7759 to schedule your free estimate.
Get a Free Estimate on Cabinets & Countertops in Berkeley
We start every job with a free on-site estimate: we measure the kitchen, check what is behind the existing cabinets, and give you a written line-item quote before any work is scheduled. Most jobs are planned within a week of the estimate and completed in two to three weeks. Call (833) 997-7759 to book yours.
Written by the team at Groundwork Construction Co.