ADU Design & Permitting in Daly City: What It Takes and What It Costs
ADU design and permitting in Daly City usually runs $45,000 – $130,000 depending on whether you’re converting existing space or building new, and the design-through-permit phase alone takes 4 to 8 months on most Daly City lots. The slow part isn’t the drawing – it’s San Mateo County plan review, hillside soils documentation, and the site survey that has to happen before anyone puts a line on paper. Call (833) 997-7759 and we’ll walk your property and tell you which path fits.
How the Design and Permit Process Actually Moves
Most homeowners expect design to start on day one. It doesn’t. Here’s the real sequence we follow on a Daly City ADU.
Stage 1: Site survey and feasibility (week 1 – 2)
Day one is a walkthrough, a look at your existing foundation, and a records pull from the city on your lot’s zoning and any prior permits. By day three we’ve usually ordered a topographic survey, because on the steep streets above the Mission Street corridor the grade can change 12 feet across a 40-foot lot. You decide at this stage whether you’re pursuing a conversion or a new structure – that one decision reshapes everything downstream.
Stage 2: Schematic design (week 3 – 6)
We bring in a designer and produce floor plans, elevations, and a site plan showing setback compliance. This is where you lock the unit size – a studio, a one-bedroom, or a two-bedroom – and the exterior finish direction. Expect two rounds of revisions. You’ll also choose at this stage whether the unit gets its own utility meters or ties into the main house.
Stage 3: Engineering and soils (week 6 – 10)
Daly City sits on wind-deposited sand and graded hillside cuts, so a geotechnical report and, on many lots, a soils or foundation letter is not optional. Structural engineering follows: shear walls, hold-downs, and a foundation design that accounts for what the soils report found. This stage is where budgets move most, and it’s why we don’t quote a final number before the soils work is done.
Stage 4: Permit submittal and plan review (month 3 – 7)
We submit the full package – architectural, structural, energy compliance, and site drainage – and respond to reviewer comments. Two rounds of corrections is typical. On hillside lots with landslide mapping overlap, a third round happens. You don’t have to do anything during review except approve any scope changes the reviewer requires.
Stage 5: Permit issuance and construction handoff (week after approval)
Once the permit is issued and fees are paid, you have a stamped set and a buildable scope. From there the project moves into construction, which for a conversion of existing space typically runs 8 to 14 weeks and for a new detached unit runs substantially longer. This phase is part of a full Home Additions & ADU in Daly City scope, and we hand you a written schedule before a single nail goes in.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Design and Spec Choices You’ll Make
None of these have a single right answer. Each trades cost against longevity, maintenance, or livability.
- Unit size and configuration: A studio conversion is the cheapest path and works well for rental income. A one-bedroom adds livability and resale value but adds roughly 120 – 200 square feet of new plumbing and framing. Two-bedroom units on narrow lots often bump setback compliance, which drives the design cost up.
- Foundation type: A slab-on-grade works on flatter lots. On graded hillside cuts, a raised or pier-and-grade-beam foundation handles the sand movement better and costs more up front. We don’t recommend the cheaper option when the soils report says otherwise.
- Exterior cladding: Stucco matches most Daly City housing stock and holds up reasonably against fog, but it cracks. James Hardie fiber cement siding resists moisture better and needs less repainting; it costs more per square foot installed. Either way, the west-facing wall needs a proper weather-resistive barrier behind it.
- Windows and doors: Fog-belt west-facing glazing takes a beating. We typically spec insulated units with good drainage detail; Therma-Tru entry doors and ViewLux window lines come up often for ADU entries. Cheap windows are the most common source of moisture complaints we’re called back to fix.
- Drainage and grading: A French drain, a swale, or a retaining wall – whichever the site plan calls for. Skipping this step on a Daly City hillside lot is the single most expensive shortcut a homeowner can take.
- Interior finishes: LVP flooring, painted drywall, and a standard appliance package keep the budget tight. Tile and upgraded cabinetry push it up. Homeowners planning to rent the unit sometimes pair this work with Full Kitchen Remodeling in Daly City if the ADU shares a kitchen wall with the main house.
What ADU Design & Permitting Costs in Daly City, CA
The design and permitting phase of an ADU in Daly City typically runs $45,000 – $130,000 when bundled with the professional services, engineering, and city fees, though the split between soft costs and construction varies widely by project. Here’s where the money actually goes.
| Item | Typical Range |
|---|---|
| Architectural design & drafting | $6,000 – $18,000 |
| Structural engineering | $3,000 – $9,000 |
| Geotechnical / soils report | $2,500 – $7,000 |
| Survey and site plan | $1,500 – $4,500 |
| City permit fees & plan check | $4,000 – $15,000 |
| Construction (conversion scope) | $30,000 – $80,000 |
| Construction (new detached, design+build) | $90,000 – $220,000 |
Five things push a Daly City ADU toward the high end: hillside grade requiring engineered retaining, dune soils demanding deeper foundations, relocating plumbing or the electrical panel, a two-bedroom layout on a narrow lot, and any overlap with landslide or environmental review mapping. A flat Serramonte lot with an existing slab and a simple studio conversion sits near the bottom. A steep Westlake lot with no existing foundation sits near the top.
A written estimate covers design fees, engineering, permit submission, and a line-item construction scope with fixed pricing. It typically does not cover city fees paid directly to Daly City, utility connection charges, or landscape and hardscape outside the ADU footprint. Ask for that list in writing before you sign anything.
See the difference
Before
After
Before
After
Before
AfterWhat Daly City Homes Specifically Do to This Job
Daly City is built on wind-blown sand dunes and the steep fog-belt slopes of San Bruno Mountain’s western flank, and that changes the design and permitting work completely compared to flatter Peninsula cities. On the steep streets above the Mission Street corridor, we routinely find original 1950s homes built on sand with minimal foundation depth, so before we can design an ADU we have to know what’s under the existing house. The persistent Pacific fog means west-facing walls in Westlake and Serramonte stay damp year-round with little sun to dry them, so any new or converted structure needs a drainage and moisture detail that inland cities don’t require. The housing stock – 1940s to 1960s stucco-over-wood-frame tract homes on poured slabs set into graded cuts – means thin lots, sandy fill, and tight setbacks that constrain unit size. Permitting runs through the municipality with San Mateo County influences on grading and drainage, and hillside lots near active landslide mapping add review steps that slow plan check. It’s not the same job as in Daly City flatlands, and we don’t design it like it is.
Serving Daly City, CA – Our Local Coverage Area
We serve Daly City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – ADU Design & Permitting in Daly City
Expect 4 to 8 months from first walkthrough to issued permit. The design phase runs 6 to 10 weeks, engineering and soils add 4 to 6 weeks, and city plan review typically takes 8 to 16 weeks with at least one round of corrections. Hillside lots with landslide mapping overlap often run longer. Call (833) 997-7759 for a realistic timeline on your specific lot.
Yes. Every ADU in Daly City requires a building permit, and hillside lots usually require a grading permit as well. There is no legal path to skip this – unpermitted ADUs create disclosure problems at resale and can trigger code enforcement. We pull the permits and manage the inspections as part of the scope, and we don’t hand off a project without them.
Sometimes. Interior conversions that reuse an existing bathroom wall and don’t touch load-bearing framing stay cheaper and permit faster. Once you relocate a kitchen, add a bathroom, or cut into a shear wall, structural engineering and a revised permit are required. We’ll tell you honestly whether the layout you want fits the existing footprint or whether it forces a redesign.
The full design-through-permit-plus-construction range runs $45,000 – $130,000, with design and engineering alone typically $12,000 – $30,000 and city fees separate at $4,000 – $15,000. Hillside grade, dune soils, and unit size move the number most. Call (833) 997-7759 for a written, line-item estimate – estimates are free and there’s no obligation.
Every ADU project we build is covered by our 730-Day Done Right Promise – if it isn’t done right, we make it right, for two full years. Design and permit work is included in that same guarantee, and we answer calls with a live person around the clock. Homeowners often pair this with Cabinets & Countertops in Daly City for the ADU kitchen, and both fall under our Home Additions & ADU service.
Get a Free On-Site Estimate for Your Daly City ADU
We’ll walk your lot, pull your records, and tell you what your ADU realistically needs before you spend a dollar on design. The estimate is free, the pricing is written and line-itemed, and the number you see is the number you pay. Call (833) 997-7759 to schedule – a live person answers around the clock.