Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Burlingame, CA: What It Costs and How Long It Takes
New cabinets and countertops in Burlingame typically run $14,000 – $45,000 for a full kitchen, with cabinet installation alone at $4,000 – $13,000 and countertop installation at $2,000 – $6,500. Most jobs take three to five weeks from demo to final caulk, and the countertop template can’t happen until cabinets are set and level. Call (833) 997-7759 and we’ll walk your kitchen and give you a written, line-item estimate.
How We Sequence Cabinets & Countertops, Stage by Stage
The order matters more than anything else on this job. Get it wrong and you’re paying twice for the same countertop.
Stage 1: Walkthrough and field measure (day 1, about 90 minutes)
We measure every wall, check for out-of-square corners and floor humps, and identify which walls are load-bearing. You decide the cabinet door style and finish here, because lead times drive the whole schedule. KraftMaid stock and semi-custom lines run 3 – 6 weeks; full custom runs 8 – 12.
Stage 2: Demo and prep (2 – 3 days)
Old cabinets and counters come out, and we inspect what’s behind them: water damage under the sink, old galvanized supply lines, missing outlet boxes. On older Burlingame homes this is where surprises surface. We patch drywall, level the floor if it’s out more than a quarter inch over eight feet, and set the plumbing rough-in for the new sink location.
Stage 3: Cabinet install (2 – 4 days)
Base cabinets get set first, shimmed and scribed to the wall, screwed into studs, then uppers go in and crown or light rail goes on. You confirm hardware placement before we drill. Anything you want changed about layout gets decided now, not after the stone is cut.
Stage 4: Template and fabrication (5 – 10 business days of waiting)
A fabricator templates the actual installed cabinets with a digital or physical jig, then cuts and polishes the slab. You choose the edge profile and sink cutout here. This gap is the one homeowners underestimate: the kitchen is unusable for about a week.
Stage 5: Countertop set, sink, and backsplash (1 – 2 days)
Stone gets set in adhesive, seams are color-matched, the sink and faucet go in, and we caulk. If you’re adding a tile backsplash, that goes last, usually two days after the counter sets. Final walkthrough covers door alignment, drawer glide adjustment, and the 730-Day Done Right Promise in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make on Cabinets & Countertops
Most of the budget swings happen in three decisions. Here’s how they trade off.
- Cabinet box construction: plywood boxes hold screws and survive moisture far better than particleboard, and in Burlingame’s damp winters that matters. Expect the plywood upgrade to add 10 – 15% to the cabinet line. KraftMaid’s plywood-construction lines are a common pick for homeowners who plan to stay.
- Door material and finish: painted MDF takes a clean, flat finish and suits the Craftsman bungalows around Burlingame Park, but it chips at the corners over time. Stained wood or thermofoil hides wear better. Full-overlay doors cost more than partial and look sharper.
- Drawers and glides: soft-close, full-extension, undermount glides are worth it on every drawer you open daily. Side-mount economy glides save several hundred dollars and feel it.
- Countertop material: quartz is the default for good reason – non-porous, no sealing, holds up to daily use. Cambria and similar engineered stone sit at the higher end. Granite costs about the same installed but needs periodic sealing. Laminate saves real money on a rental or flip. Butcher block and marble are beautiful and high-maintenance; marble etches from lemon juice.
- Sink and faucet: undermount sinks pair with stone; drop-in sinks are fine with laminate. A single-basin 30-inch undermount in a real brand (Kohler, for one) is the sweet spot.
- Backsplash height: a 4-inch splash is included in most jobs; full-height tile to the uppers is a separate line, typically $800 – $2,500.
What Cabinets & Countertops Costs in Burlingame, CA
A full cabinet and countertop replacement in Burlingame runs $14,000 – $45,000. Here’s roughly how that splits:
Before
After
Before
After
Before
After