Garage Conversion ADU in Burlingame: What It Takes and What It Costs
A garage conversion ADU in Burlingame typically runs $30,000 to $80,000 and takes 8 to 16 weeks once permits are pulled, depending on whether you’re adding a bathroom and kitchenette or keeping it as a studio. The work turns your existing garage into a permitted, rentable living space – new slab or floor system, insulated walls, egress, plumbing and electrical rough-in, and a final inspection. Call (833) 997-7759 to schedule a free on-site estimate.
How We Run a Garage Conversion ADU, Stage by Stage
A garage conversion looks simple on paper. In practice, the sequence matters as much as the finish work, because each inspection gates the next phase.
Stage 1: Site evaluation and design (1 to 3 weeks)
We start by inspecting the existing slab, the framing above, the electrical panel capacity, and how the garage connects to the main house. On Burlingame’s older homes, this is where we find out whether the garage was ever properly finished or just framed and left raw. You decide the layout at this stage: studio versus one-bedroom, bathroom location, and whether a kitchenette is part of the plan. Those choices set the plumbing and electrical drawings.
Stage 2: Permits and design review (3 to 8 weeks)
Burlingame requires a building permit for any garage conversion that creates habitable space, and the plan check depends on how your property is zoned and whether the garage sits in a design-review overlay. We handle the submittal and respond to plan-check comments. You’ll need to confirm the conversion doesn’t push you past your lot’s parking minimum – a real consideration on Burlingame’s narrow lots.
Stage 3: Demolition and rough-in (2 to 4 weeks)
We remove the existing garage door and frame in a new wall with a window or sliding door, then address the slab. If the garage floor sits below the main house grade, we raise it or add a moisture barrier and vapor retarder before framing. Electrical rough-in, plumbing for the bathroom, and HVAC or mini-split lines go in next. Burlingame’s damp winters make the vapor barrier and slab insulation non-negotiable – skip it and you’ll fight moisture for years.
Stage 4: Insulation, drywall, and inspections (3 to 4 weeks)
Rough framing, electrical, and plumbing inspections happen before drywall goes up. Then insulation rated for the wall assembly, drywall, and the finish trades. You’ll choose flooring, paint, fixtures, and door style during this window. This is also when we finalize the exterior detail matching – critical on Burlingame’s wood-sided and stucco homes, where the converted garage face is visible from the street.
Stage 5: Finishes, final inspection, and handoff (2 to 3 weeks)
Flooring, trim, paint, bathroom tile, and fixtures. The final building inspection covers egress, smoke and carbon monoxide alarms, ventilation, and the electrical sign-off. We walk the space with you, document everything, and hand over the as-built drawings. The whole job sits under our 730-Day Done Right Promise – if something isn’t right, we come back and fix it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Burlingame Garage Conversion ADU
Most of the cost swing comes down to a handful of decisions you’ll make in the first two weeks. Here’s what you’re actually choosing between:
- Slab versus raised floor: Keeping the existing slab is cheapest but limits plumbing flexibility and can trap moisture on Burlingame’s damp ground. A raised floor system adds cost but gives you better insulation and easier drain routing.
- Bathroom or no bathroom: A half-bath is the minimum for a legal ADU; a full bath with a walk-in shower adds real rental value. Tile and fixture grade swing this by several thousand dollars.
- Kitchenette versus full kitchen: A compact sink, two-burner cooktop, and small fridge keeps the plumbing simple. A full kitchen means more circuits, more venting, and a bigger permit scope.
- Mini-split versus through-wall HVAC: A ductless mini-split handles Burlingame’s cool, foggy summers and damp winters efficiently. Through-wall units cost less upfront but run louder and less evenly.
- Window and door systems: The new street-facing wall needs glazing that holds up to coastal moisture. We work with Therma-Tru doors and ECO Window Systems glazing, both of which hold up well in Peninsula humidity.
- Exterior cladding match: On Burlingame’s older homes, the converted garage face has to match the house – stucco, wood siding, or a blend. Mismatched cladding is the most common reason a conversion looks tacked-on.
What a Garage Conversion ADU Costs in Burlingame
The full range for a garage conversion ADU in Burlingame is $30,000 to $80,000. Here’s how that breaks down by scope:
- Studio conversion, no bathroom, basic finishes: $30,000 to $45,000
- Studio with half-bath and kitchenette: $45,000 to $60,000
- One-bedroom with full bathroom and kitchenette: $60,000 to $80,000
Five variables push a job toward the high end: whether the slab needs replacing or raising, how far plumbing and electrical have to travel from the main house, whether the existing garage has structural issues (rotted framing, failing piers), the finish grade you choose, and the permit scope if Burlingame design review applies to your property.
A written estimate from us breaks out demolition, rough-in, finishes, permits, and inspections line by line. The number you see is the number you pay. What typically isn’t included: unforeseen structural repairs discovered after demo, plan-check fees Burlingame charges directly, and any landscape repair around the converted garage. We flag those before work starts, not after.
See the difference
Before
After
Before
After
Before
AfterWhat Burlingame Homes Do to a Garage Conversion ADU
Burlingame’s core is dominated by early-1900s through 1940s single-family homes – Craftsman bungalows, Spanish Colonial Revival, and Tudor cottages – and many of them have garages that were never built to modern code. On the older homes in Easton Addition and Burlingame Park, we routinely find previous remodel layers stacked on original framing, so opening the garage reveals a cascade of code upgrades – foundation bolting, shear, and knob-and-tube-era wiring – that the drawings never anticipated. That’s the real cost driver here, and it’s why a thorough site evaluation matters more in Burlingame than in newer subdivisions.
The climate adds another layer. Burlingame sits between the bay and the coastal hills, with cool fog-influenced summers and damp winters that leave persistent morning moisture on exterior surfaces. For a converted garage, that means proper flashing, a correctly installed vapor barrier, and exterior detailing that sheds water – especially if the street-facing wall is wood-sided or stucco. We see this failure mode most often on conversions done without a moisture plan: three or four winters in, the sill plates start to rot.
If you’re planning a larger project that includes the conversion, it’s part of a full Home Additions & ADU in Burlingame scope, and we handle both under one contract. Homeowners often pair the conversion with Backsplash, Tile & Flooring in Burlingame for the new bathroom and kitchenette. You can see our wider Home Additions & ADU work and the other Burlingame services we cover. For finishes inside the main house after the conversion is done, many of our clients also book Cabinets & Countertops in Burlingame.
Serving Burlingame, CA – Our Local Coverage Area
We serve Burlingame and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Garage Conversion ADU in Burlingame
Plan on 8 to 16 weeks of construction once permits are issued, plus 3 to 8 weeks for plan check. Total timeline from first call to final inspection is usually 4 to 6 months. Call (833) 997-7759 for a timeline specific to your garage.
Yes. Any conversion that creates habitable living space requires a building permit, and Burlingame’s plan check may include design review depending on your property. We handle the submittal and inspections. Call (833) 997-7759 to talk through your property.
Sometimes, but not usually. A studio with a half-bath can often reuse existing plumbing routes, while a full bathroom and kitchenette almost always require running new supply and drain lines. Structural changes depend on whether the existing framing is sound. We assess this on the first visit.
The range is $30,000 to $80,000 depending on scope. A basic studio runs $30,000 to $45,000; a one-bedroom with full bath and kitchenette runs $60,000 to $80,000. Call (833) 997-7759 for an exact quote – estimates are free.
Every conversion is covered by our 730-Day Done Right Promise – if the work isn’t right, we come back and fix it. That covers workmanship across framing, electrical, plumbing rough-in, and finishes. Call (833) 997-7759 with questions about coverage.
Get Your Free Garage Conversion ADU Estimate in Burlingame
Call (833) 997-7759 to schedule a free on-site estimate for your garage conversion ADU in Burlingame. We’ll walk the garage, check the slab and panel, talk through layout options, and give you a written line-item quote with fixed pricing – no change orders, no surprises. If it’s part of a larger project, we scope it all under one contract. One call, one crew, one warranty.